Society

Weather forecast for the next 10 days from November 11 to November 20 in all three regions

|

The National Center for Hydro-Meteorological Forecasting forecasts the weather for the next 10 days (from the night of November 10 to November 20) in areas across the country.

From November 14, how will people pass through the Xuan Dieu - Au Co area?

|

Hanoi - In order to reduce congestion and ensure traffic safety, from November 14, the city will adjust traffic organization at Xuan Dieu - Au Co intersection.

Proposal to resolve the accident that killed 3 people and ensure safety of My Phuoc - Tan Van road

|

HCMC - On November 10, the HCMC Department of Construction sent an urgent dispatch requesting relevant units to resolve the serious accident that killed 3 people.

Construction of An Phu, My Thuy intersections, Metro No. 2 HCMC causes damage to roads, traffic jams

|

HCMC - The construction of An Phu intersection, My Thuy intersection, and relocation of Metro 2 infrastructure has caused many degraded and damaged roads, causing traffic congestion.

20h News: Proposal of over 50% of households approving to continue developing a project to change the names of provinces and communes

|

20h News on November 10: More than 50% of households must agree to continue to develop a project to merge and rename provinces and communes; The weather in the North is about to change...

Weather forecast for tonight and tomorrow 1.11

|

Latest weather forecast 1.11: Cold air strengthens, causing heavy rain in the Central region. The North will have rain in some places, cold weather, some places are cold.

Hot Saigon: The dead end in the center is about to be expanded from 5m to 17m and connected

|

Hot Saigon 10/31: The dead end in the center is about to be expanded from 5m to 17m and connected; Ho Chi Minh City becomes a strategic investment destination;...

3 boys swept away by water while crossing the spillway, 1 boy missing

|

Quang Tri - 3 boys in Quang Trach commune were swept away by water while passing through the spillway, 2 were saved, 1 is still missing.

Removal of a deputy director of the Project Management Board in Dak Lak

|

Dak Lak - The competent authority has dismissed a deputy director of the local project management board.

Hanoi proposes to stop organizing fireworks displays on the evening of November 4

|

Hanoi requested the Organizing Committee of the Autumn Fair to stop organizing fireworks displays on the evening of November 4 to share and accompany people in the Central region who were heavily affected by floods.

The information "child kidnapped at apartment building 17T2 Trung Van" is a misunderstanding

|

Hanoi Regarding the information about a child being kidnapped at apartment building 17T2 Trung Van, a representative of the building management board affirmed that this is incorrect information.

Nearly 1,700 houses were flooded, 5,600 hectares of crops were damaged by floods in Lam Dong

|

Lam Dong - From October 26 to the morning of October 31, prolonged heavy rain caused significant damage to people, property and agricultural production in the province.

Dong Nai deploys relocation of power grid infrastructure under high-speed railway project

|

Dong Nai - The Provincial People's Committee assigned units to relocate the power grid under 100kV and over 110kV of the high-speed railway project on the North - South axis.

The Ministry of Construction directs railways to plan to stop trains during flooding

|

The Ministry of Construction has just issued a telegram on overcoming the consequences of floods in the Central region. In particular, the railway industry plans to stop trains when flooded.

Heavy rain is likely to cause floods to return, forecast to gradually decrease the rainfall

|

Heavy rain in the Central region is forecast to last until around the night of November 4th; there is a risk of flooding again on rivers from Quang Tri to Da Nang city.

Da Nang mountainous commune headquarters suffered serious landslides, the whole commune was cut off

|

Da Nang - Prolonged heavy rain caused landslides and cracks in the wall of the headquarters of the People's Committee of Hung Son commune, causing the risk of collapse.

HCMC on October 31: HCMC lacks 965 civil servants with in-depth expertise

|

Ho Chi Minh City has 1,065 surplus civil servants but still lacks 965 civil servants with in-depth expertise; Fine of 19 million VND for a driver driving in the wrong direction on My Phuoc - Tan Van road...

Colonel Dao Ba Viet holds the position of Commander of Coast Guard Region 4

|

An Giang - The Minister of National Defense appointed Colonel Dao Ba Viet - Deputy Chief of Staff of the Vietnam Coast Guard to hold the position of Commander of Coast Guard Region 4.

Lam Dong provincial leaders directly inspect and direct relief for people in flooded areas

|

Lam Dong - Provincial leaders directly inspected, directed the recovery of flood consequences and visited and encouraged people isolated by floods.

The Ministry of Construction hands over a section of the North-South Expressway

|

On October 31, the Ministry of Construction Information Portal published the decision to hand over the Vung Ang - Bung expressway under the North - South expressway.